新闻资讯   当前位置:首页> 新闻中心 > 新闻资讯住人集装箱和活动板房安装的步骤
住人集装箱和活动板房安装的步骤来源:http://www.jnpkjzx.com   时间:2022-05-05
住人集装箱和活动板房安装九大步骤:
Nine steps for the installation of living containers and movable plank houses:
1、挖槽;2、基础,有做砖基础的,也有砼基础的;3、型钢结构构架进行安装;4、安装一个楼梯,走道;5、如果是通过多层发展的话,安装工程预制混凝土楼板;6、彩钢板安装;7、首层设计地坪;8、门窗系统安装;9、室内装饰装修。
1. Trenching; 2. Foundation, including brick foundation and concrete foundation; 3. Installation of section steel structure frame; 4. Install a staircase and walkway; 5. If it is through multi-storey development, the installation of precast concrete floors; 6. Color steel plate installation; 7. Design floor of the first floor; 8. Installation of door and window system; 9. Interior decoration.
具体的安装步骤一:
Specific installation steps 1:
它与建筑物相似,周围和间隔墙的基础要平整,以较为坚固的钢筋混凝土或墙砖砌体为好,柱与框架用横梁连接,用隔墙板、外墙板和门窗框架,然后安装楼板檩条,安装楼梯、地板桁架,再安装一层,后安装屋顶和屋面板,后安装门窗,拉动竖向支撑。
It is similar to buildings. The foundation of the surrounding and partition walls should be flat. It is better to use relatively solid reinforced concrete or wall brick masonry. The column and frame are connected with beams, and the partition board, exterior wall board and door and window frame are used. Then the floor purlin, stairs and floor truss are installed, and then the first floor is installed. After that, the roof and roof panel are installed, and then the doors and windows are installed to pull the vertical support.
具体的安装步骤二:
Specific installation steps 2:
其实对于住人集装箱的安装方法就是轻钢建筑结构,与重钢结构设计厂房很类似。活动房隐蔽信息是指在施工过程中,完成上一道工序后,将被下一道工序所掩盖,全部完工后无法及时进行分析检查的部位,做居室装修,“隐蔽工程”是关键,如果“隐蔽工程”没有工作做好,表面作为装饰得再漂亮,也是一种徒劳。
In fact, the installation method of residential containers is light steel building structure, which is very similar to the heavy steel structure design workshop. The concealed information of the movable house refers to the parts that will be covered up by the next process after the previous process is completed and cannot be analyzed and inspected in time after the completion of the whole process. For the decoration of the living room, "concealed works" is the key. If the "concealed works" are not done well, the beautiful surface decoration is futile.
具体的安装步骤三:
Specific installation steps 3:
活动板房可分为水安装、电安装及防潮、防水等项目。其中的每一个项目都不容忽视,如果没有哪一个环节出了问题,都可能带来更加严重的经济损失,甚对人身全带来巨大伤害。
Movable plank houses can be divided into water installation, electricity installation, moisture-proof, waterproof and other projects. Every project can not be ignored. If there is no problem in any link, it may bring more serious economic losses and even great harm to the whole person.
以上就是为大家介绍的有关济南集装箱厂家的详细介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务http://www.jnpkjzx.com
The above is the detailed introduction of Jinan container manufacturers. I hope it will be helpful to you If you have any questions, please contact us We will provide service for you with our attitude http://www.jnpkjzx.com